Enviar mensagem
Contacte-nos

Pessoa de Contato : Hanna

Número de telefone : 86-18702773499

Whatsapp : +8618702773499

Free call

500~2500mm Length Ground Mounting Screw Pile Driving Rack

Quantidade de ordem mínima : grupo 5 Preço : USD800-2000/set
Detalhes da embalagem : Embalagem padrão da exportação Tempo de entrega : 15-25 dias do trabalho
Termos de pagamento : L/C, D/A, D/P, T/T, Western Union, MoneyGram Habilidade da fonte : 30MW/month
Lugar de origem: CHINA Marca: TIANFON
Certificação: SGS,ISO 9001,ISO 14001,OHSAS 18000 Número do modelo: Pilhas à terra do parafuso

Informação detalhada

Instale o local: Todos os tipos de solo Material: Aço Q235B
Diâmetros: 76 mm~200 milímetro Espessura: 3~3.5mm
Anticorrosivo: O mergulho quente da classe alta galvanizou comprimento: 500~2500 milímetros
Realçar:

2500mm Ground Mounting Screw Pile

,

500mm Ground Mounting Screw Pile

Descrição de produto

500~2500mm Length Customize Design Ground Mounting Screw Pile Driving Rack

 

Ground Screw Piles is the preferred foundation in many applications, such as Photovoltaic Solar Farm construction, Timber-frame Housing, Timber Decking, Street Light and Fence construction, Temporary Site Accommodation, Bill Board/Advertising Signs and many more applications.

 

Specifications:

 

Name

Size(mm)

Thickness(mm)

Material

Surface treatment

Photo

Piles with flange

φ 76/89,1000-2000mm(Length)

4

Q235B

Hot-Dip Galvanizing

500~2500mm Length Ground Mounting Screw Pile Driving Rack 0

Piles without flange

φ 76/89,1000-2000mm(Length)

4

Q235B

Hot-Dip Galvanizing

500~2500mm Length Ground Mounting Screw Pile Driving Rack 1

Steel pipe piles

φ 76/89,1000-2000mm(Length)

4

Q236B

Hot-Dip Galvanizing

500~2500mm Length Ground Mounting Screw Pile Driving Rack 2

 

Products can be customized according to customer requirement.

 

Features:

 

Are cost effective

 

Can be installed through ground water without casing

 

☀ Can be removed for temporary applications

 

☀ Are easily transported to remote sites

 

Typically required less time to install

 

☀ Torque is a strong verification of capacity

 

Reduce the number of truck trips to a site

 

Eliminate concrete curing and formwork

 

☀ Can be installed at a better angle for added laterial risistance

 

☀ Can be installed with smaller more accessible equipment

 

☀ Are installed with low noise and minimal vibrations

 

☀ Can be galvanized for corrosion resistance

 

☀ Minimize disturbance to environmentally sensitive sites

 

500~2500mm Length Ground Mounting Screw Pile Driving Rack 3

 

Packaging and delivery:

 

► Port: Tianjin, Shanghai, Qingdao

 

► Package: strong and long distance transportation package

 

► Payment Terms: L/C,D/A,D/P,T/T

 

► Delivery Detail: Delivery time:7--25 days after receiving customer’s deposits

 

500~2500mm Length Ground Mounting Screw Pile Driving Rack 4

 

Our Certificates:

 

500~2500mm Length Ground Mounting Screw Pile Driving Rack 5

500~2500mm Length Ground Mounting Screw Pile Driving Rack 6

 

Você pode estar nesses
Entre em contato conosco

Incorpore sua mensagem

info@cntfsolar.com
+8618702773499
Hanna1819
86-18702773499